The project is located in the II Region of Antofagasta Chile, 80 km north of Taltal. The full mining property is for mining exploitation (measurements) and includes 1350 Ha. Easy and close access to electricity, through the high voltage line. The sea is less than 2 km away. Strictly mining area, without environmental or community problems.
There are thousands of chip-type surface samples, trenches and interior mine samples, Geophysics (IP) and detailed geology. 3D model. In addition, the mining property includes other targets with interesting outcrops mineralized with copper oxides.